Spread adhesive, lay tiles level and grout the joints accurately.

Tile spacers, 2 mm, Rubi
Key features
- Size (mm)2
- Pack (pcs)1
What it is
Tile spacers, 2 mm, Rubi. Key specifications: size (mm) 2, pack (pcs) 1.
Tile and slab spacers are cross spacers, wedges, levelling systems and pedestals that keep joints even and surfaces aligned during laying.
What it is for
Used for laying large-format slabs, where handling and flatness are the challenge and for laying tiles and slabs, from spreading the adhesive to grouting.
How to use it
Insert cross spacers and spacers between the tiles in the fresh adhesive to keep the joint width constant, and remove them before grouting. Place levelling clips under the slab edges and tighten them with a wedge or pliers until the slabs are aligned, then snap them off once the adhesive has set. Adjust raised floor pedestals by screwing the head up or down to the required level.
Where it is used
- Residential construction
- Renovation
Technical data
- Size (mm): 2
- Pack (pcs): 1
Who it is for
Designed for mosaicists, tilers, floor layers and wall tiling and cladding fitters.
Related products
- Reinforced tile spacers, 3 mm, L-shaped, Rubi
- Tile spacers, 2 mm, L-shaped, Rubi
- Palbox sponge Superpro Rubi — from the category Tile Laying and Grouting Tools
- Easylift EL-Simple slab handling device Probst — from the category Installation Products and Accessories
- Scoring wheel TI Ø18mm Rubi — from the category Tile Cutting, Finishing and Shaping Tools
- Browse the whole category: Spacers for Floor Slabs and Tiles
Before you order
In your request, please state the dimensions and the quantities required, so we can give you the right quotation first time.
For prices and availability, request a quote from AMES Srl: we will reply with our quotation, delivery times and, where needed, an equivalent technical alternative.
Specifications 3
| Item code | 02000 |
|---|---|
| Size (mm) | 2 |
| Pack (pcs) | 1 |
The perfect setup for this job
Everything you need in one place, from functionality to safety.
For the job
Spread, smooth and finish mortars, renders, adhesives and skim coats by hand.
Cut, drill, bevel and polish tiles and slabs during laying.
Check surfaces and levels and transfer measurements and alignments before laying or fixing.
For safety
Protect knees from pain and crushing when working kneeling on the ground.





