Skip to content
0 Quotes 0Compare

Dust Barrier Walls for Construction Sites

16 products · Signage and Safety Management

Dust partitions isolate the work area from the rest of the premises during renovations, sanding and other work that raises dust. They are installed without building work: telescopic poles anchored between floor and ceiling support plastic sheets, and access remains possible thanks to zip openings.

What you will find in the collection

  • HEYWALL dust control walls by Heylo, with telescopic poles and sheets
  • Zips to apply to the sheets to create a re-closable opening
  • Ceiling clamps for anchoring the poles
  • Plastic dust doors to fix in the door opening

How to choose

Measure the height of the room between floor and ceiling, because the telescopic poles have an adjustment range, and the width of the section to be closed off. If you need to pass frequently through the isolated area, provide for a zip or a door. Finally, consider the duration of the work and the number of rooms to be separated.

Versions and components

The HEYWALL system is available in Base, Plus and Profi versions. It is built from system bars and extensions, head and foot plates, side and ceiling clamps, sealing rails and clear film, with corner and quick-release adapters and a carry bag. For passageways there is also the DCD-3,0 door barrier kit.

See also: Single-phase industrial vacuums, Rubble chutes and Tarpaulins.

AMES sells on a quotation basis: tell us the dimensions of the rooms and the quantities and we will prepare the right kit.

How to choose a dust barrier for building sites and renovations
16 results

Products in this collection

Frequently asked questions: Dust Barrier Walls for Construction Sites
What is a dust barrier wall used for on a building site?

A dust barrier wall separates the work area from the rest of the premises during renovation, sanding and light demolition. The system uses telescopic poles between floor and ceiling and plastic sheeting, so it requires no building work. It protects neighbouring areas, whether occupied or in use, from site dust.

Which versions of the HEYWALL wall are in this collection?

There are three versions of the Heylo HEYWALL dust control wall, called Base, Plus and Profi. To see what equipment is included in each, compare the product pages of the three models. The collection also includes individual components, such as bars, clamps and film, to complete or replace parts of the system.

Dust barrier door or zip: which should I choose for getting through?

There are two solutions for passing through the wall. The plastic dust barrier door is a rigid element to be fixed into the sheeting, while the zip is applied directly to the sheeting to create a re-closable opening. Consider how many times a day you will need to pass through and choose accordingly.

How do I adjust and secure the poles of the barrier wall?

The system is locked in place with telescopic poles between floor and ceiling, completed by ceiling and side clamps and by top and base plates. Adjust the length of the poles until the structure is under tension, and check that the wall is stable before starting work. Do not place loads on the poles.

What accessories do I need to transport and complete the wall?

The collection includes the carry bag, the system bars with their extension, the transparent film, the sealing guides and the corner or quick-release adapters. The bar extension adapts the length of the wall to the opening to be closed off. Store the components in the bag so they don't get lost.

Who uses dust barrier walls and for what jobs?

They are used by renovation contractors, installers, sanding specialists and anyone working in occupied buildings or in offices open to the public. The system is useful for isolating plaster removal, floor sanding and any work that produces fine dust. The door barrier kit is used to close off a single doorway.

How do I use the dust barrier wall safely during works?

Keep the openings closed during work so that the dust stays in the isolated area. Check the sheeting and zips regularly, replacing the film if it is torn. Do not remove the clamps until the work is finished. If there are live electrical systems in the area, mark them and coordinate the work with the site manager.